The public has suggested changing the design and colour of the overhead train prototype for the Cat Linh-Ha Dong urban railway project in Hanoi, the Railway Project Management Unit said.
Photo shows the overhead train prototype for the Cat Linh - Ha Dong urban railway project (Photo: VNA)
Hanoi (VNA) - The public has suggested changing the designꦑ and colour of the overhead tra𒐪in prototype for the Cat Linh-Ha Dong urban railway project in Hanoi, the Railway Project Management Unit said.
Le Kim Thanh, director of the unit, said that after one month, the unit has received roughly 2,000 comments from the public on the design of the trains.
The model train, manufactured by China's Beijing Subway Rolling Stock Equipment Co.Ltd, will be among 13 trains to run the rail route beginning at Dong Da district's Cat Linh street and ending at Yen Nghia Bus Station in Ha Dong district.
As many as 13 trains with a total value of more than 63 million USD will be purchased if the model's design is completed.
Thanh said many comments were negative. About 36 percent showed their dissatisfaction on the look of the overhead train and 32 percent proposed changing its green colour. However, they did not give any reasons or propose any changes.
For example, many opinions said that the green colour was not beautiful and modern enough, and duplicated the colour of a well-known transport business.
However, none gave any recommendations on a specific colour to change to. Thus, there was no basis to say which colour was the best.
There were comments on the train cover. It was made of stainless steel to increase its longevity. As a result, there was no need to paint the entire train, he said.
In terms of the design of the overhead train prototype, many have raised their opinions to make it shark-like or bullet-like similar to those that travel on high-speed rails.
According to Thanh, the train was designed following the train standard, which was equipped with ladders at emergency exits for passengers to easily escape in emergency cases.
The train is an urban public transport which should carry a large number of passengers and its speed is only 35 kph. Thus, to create maximum space to accommodate passengers was the priority.
Making it more shark-like, the train would have technical issues, blocking the sight of drivers and the emergency exits, he added.
Thanh said the unit will suggest the Ministry of Transport set up a committee to evaluate comments and decide what should be changed.
He also said that the unit would consider switching to the blue colour. Another design such as installing more grips for standing passengers and using female voices for on-board announcements would be considered and changes made if necessary.-VNA
The Hanoi People's Committee has approved a transport development plan for the period from 2011-15, a project estimated to cost 153 trillion VND (7.5 billion USD), which aims to upgrade the city's transport infrastructure and address traffic problems.
In the April proposal, the Hanoi Transport Department requested more than 260 trillion VND (13 billion USD) to carry out the plan. This figure, which amounts to 20 per cent of the city's GDP, raised concerns among both experts and the public about the feasibility of funding the proposal, and the projected cost was reduced to 145 trillion VND (7 billion USD) in a later draft of the budget released this month.
Transport Minister Dinh La Thang has said the construction of the Cat Linh-Ha Dong Railway Project should be speeded up so that commercial operations could begin by June 30, 2016.
The progress of urban train projects have not met public expectation, said Deputy PM Hoang Trung Hai during a recent meeting to review the progress of urban train projects in Hanoi and HCM City.
The total investment exceeded 319 billion VND (12.2 million USD), including over 261 billion VND from the state budget and 57.5 billion VND mobilised from businesses, organisations, and individuals.
The Mekong Delta province of Tien Giang is intensifying efforts to combat illegal, unreported and unregulated (IUU) fishing as part of the country’s goal of having the European Commission’s “yellow card” warning lifted.
Throughout its 80-year history, the VNA has remained at the forefront of information dissemination. It has consistently delivered timely, accurate, and objective reports on both domestic and international events, serving the Party’s leadership, the State’s management, and the public’s demand for official news.
With strong support from local authorities, businesses, organisations, and residents, the province has successfully built or repaired 10,707 homes for disadvantaged households, including war veterans, families of martyrs, ethnic minority people, and low-income residents.
Throughout its resistance against colonialists and imperialists, Vietnam developed a revolutionary press that has served as a benchmark for just and legitimate causes worldwide.
Founded in 1842, the Vienna Philharmonic is regarded as a cultural ambassador of Austria, with prestigious conductors like Mahler and Karajan who shape its legacy. Its New Year’s Concert, broadcast to over 90 countries annually, stands as a global symbol of classical music excellence.
PM Chinh lauded the press’s historic role in the nation’s fight for independence and its ongoing process of national development, affirming that the Government always highly appreciates the close partnership and steadfast support of press agencies and journalists nationwide.
In recent decades, Vietnam’s mainstream media has become a reliable and persuasive channel for showcasing the nation’s development policies and achievements, especially in economic matters, according to a senior assistant editor at the Times of India.
A hub for sharing best practices, the event aims to forge solutions for financial sustainability, public media contracts, audience engagement, content innovation, and newsroom restructuring. It is also a moment for Vietnam’s media to accelerate its progress and figure out what the “revolutionary press” means in a new era.
From “Thanh nien”, Vietnam’s first revolutionary newspaper founded by Nguyen Ai Quoc (later President Ho Chi Minh) on June 21, 1925, the revolutionary press has remained devoted to its sacred missions -accompanying the nation, serving the Fatherland, and working for the people.
The official launch of Emirates’ Dubai–Da Nang route on June 2 has sparked a “tourism revolution” for Vietnam’s central coastal city. Da Nang is emerging as a top destination for high-end travelers, particularly from the lucrative Middle Eastern market.
Bernama CEO Datin Paduka Nur-ul Afida Kamaludin said VNA has been a consistent and reliable partner in OANA, contributing actively to the regional media landscape through content sharing, coordination, and policy discussions. Their coverage of ASEAN and Indochina issues adds valuable perspectives. Bernama appreciates the collaboration with VNA.
In this era of global integration and digitalisation, the press must adopt modern multimedia models to not only meet increasing information and communication demands but also align with the broader socio-economic development of the country.
A master plan on implementation of recommendations accepted by Vietnam under the fourth cycle of the Universal Periodic Review (UPR) of the United Nations Human Rights Council (UNHRC) took effect on June 17.
Running until June 21, the festival brings together more than 80 central and local media organisations, featuring nearly 130 exhibition booths that cover the full spectrum of national life, encompassing economy, politics, culture, society, defence, security, and foreign affairs.
As of June 17, Ca Mau province had achieved its target of supporting the construction and renovation of 4,400 homes, with a total budget of over 235 billion VND (about 9 million USD).
Chairman of the Vietnam Journalists’ Association (VJA) Le Quoc Minh has called for technology to be leveraged not to replace identity, but to enhance it—allowing Vietnamese journalism to reach both local and global audiences.