Hanoi (VNA) – The Vietnam Oil and Gas Group (Peꦇtrovietnam) posted the highest revenue in October since the beginning of this year, reported its General Director Le Manh Hung at a recent monthly meeting.
During the month, all production figures of Petrovietnam exceeded the monthly plan. The oil extraction volume reached 0.85 million tonnes, surpassing by 4.2%. Cumulatively for 10 months, it reached 8.7 million tonnes, or 13.1% higher than the 10-month target.
The gas extraction volume hit 0.62 billion cu.m, exceeding the monthly plan by 4.6%. The 10-month volume was 6.38 billion cu.m, or 9.7% higher than the initial plan. The electricity production reached 1.91 billion kWh in October and 19.54 billion kWh in 10 months, up 2.4% and 1.7% from respective plans, respectively.
The fertiliser production in October stood at 161.800 tonnes, or 9.6% higher than the set goal. It reached 1.46 million tonnes in 10 months, topping the plan by 5.9%. Meanwhꦅile, the petrol production, excluding the products of Nghi Son refinery and petrochemical company, reached 6.08 million tonnes, or two months ahead of schedule, up 5.9% annually.
He called for continuing to improve the internal management system, especially processes, regulations, and rules; and dealing with issues in accordance with the conclusions of the State Audit Office; completing the 5-year plan and the 2024 plan, while setting comprehensive management objectives from the beginning of next year.
In particular, he suggested establishing a steering committee in charge of implementing the Petrovietnam’s restructuring scheme for the 2021-2025 period recently approved by the PM. The committee must thoroughly analyse the restructuring work for each sector and area, assign specific tasks, and propose con🌊crete solutions to successfully accomplish the set goals./.